p2-case2
  • Project :
    Shell Curlew C
  • Agent / Client:
    Duco / Technip / Shell
  • Workscope :
    Demob / Mob / Spooling 1 x umbilical
  • Vessel:
    Wellservicer Draft 6.5m to 7.25m / Length 111.4m
  • Location :
    Under Radius Of Dockside Crane – Shepherd Offshore – Offshore Technology Park – Walker – Newcastle
  • Date / Time Arrival :
    28/5/08 10:15hrs
    Date / Time Departure :
    30/5/09 10:30hrs

Shepherd Offshore Services Provided :

  • Demob Hotworks & Lifting
  • Set up spooling operations
  • Loading setting up Aquatic Towers on vessel
  • Heavy & Abnormal lifting services
  • Mobile crane plant hire
  • Material handling solutions reference spooling
  • Fabrications services
  • Storage solutions
  • Mob fast turnaround

Shepherd Offshore Comments:

Shepherd Offshore ensured a well planned, safe and efficient load out was concluded with out incident and on schedule. The client issued a special thanks to the company’s Lifting Supervision for their “efforts and cooperativeness through out”