  • Project :
    Weldex – SL6000 – Load Crawler Crane 64 x Pieces

    Workscope :
    Unload Crawler Crane 64 x pieces transport to quay.

    Discharge 8 x Reels Empty 45T each Ex Wellstream

    Load Crawler Crane 64 x pieces quay to vessel.

    4 x Pieces National Oilwell Equipment (Drill Line Reeler / Xmas Tree Holder)

  • Agent / Client:
    Denholm Barwil / Wellstream / Weldex

    Vessel:
    Jade C
    145m Length / Draft 6m

    Date / Time Arrival :
    14/11/08 07:45hrs

    Date / Time Departure :
    16/11/08 14:10hrs

    Dayshift

Shepherd Offshore Services Provided :

Transport Discharge / Storage / Post Load out Inspection / Lifting Plan Review / Heavy & Abnormal lifting services / Seafastening Services / fast turnaround.

Diagrams

Click Image To Enlarge Diagram
Visio-205 SB Newcastle.vsd

Shepherd Offshore Comments:

We achieved a fast turn around for the vessel and managed to meet the individual targets for the various parties. Shepherd Offshore offloaded 8 x Empty Reels for Wellstream and removed them from radius of our dockside crane via straddle truck. Weldex Crawler Crane & Equipment was reviewed by all parties and then a loading sequence was agreed / confirmed with the vessel. We worked efficiently ensuring that the dockside crane was supplied continuously with equipment to load.