Project:
E062 (1) Heavy reel Load out
Agent/Clients/Third Parties:
Wellstream (now BHGE) / Seastream & BHP
Workscope:
Operation Type: Reel Loadout
Description of Scope: 24 x Reels @ 250T + 11 x containers - 1st shipment
22 x Reels @ 250T + 12 Containers + 13 x Lightweight reels + 1 Jumper - 2nd shipment
Vessel:
Beluga Intonation
Draft 6.6m / Length 116.3m
Services provided:
- Lift Design Engineering
- Pre-arrival Planning
- Reel Loadout
- Mobilisations (2 Vessels)
- Heavy Lifting Services (250T Reels)
- Seafastening Solutions
- Transportation Solutions
- Mobile Crane Support
- Material Handling Solutions
- Load Bearing Solutions
- Devanning Solutions
- Storage Solutions
- Project Management
- Logistics Support
- Vessel Support
- Quayside Assistance
Testimonial:
"The Shepherd Offshore terminal is known to have a reputation for providing very professional services in respect to loading and discharging subsea equipment, such as umbilical reels. There were a variety of cargo handling options, including forklifts and small cranes. Supervision and Management were very organised and cooperative. The workforce was qualified, well-trained and very skilled. Overall, the company’s attitude and quality of work were excellent."
Cargo Superintendent
Shepherd Offshore Comments:
"Shepherd Offshore performed the loadout in conjunction with Wellstream (BHGE) / Beluga Shipping. One of the largest projects to be shipped from Offshore Technology Park, Shepherd Offshore worked closely with all stakeholders ensuring excellent service support in a timely and safe manner, pre, during and post-loadout."
General Manager, Shepherd Offshore